ROUGH IN PHASE

Here we have the plumbing drain lines installed inside the foundation from each toilet, sink, or appliance, leading into an outlet to the septic system holding tank.  Also, the fresh water line is
installed from the street to the edge of the foundation at the entry point.  Next, the electrician will install floor outlets, and the main electric line entry point, and inspections will be requested.